天天摸天天插天天操-2亚洲av-国产AV大片-无码人妻一区二区三区潮湿-91精品伊人-中文字幕国产视频

Wenzhou Zeneng Electric Power Equipment Co., Ltd.

HomeContact

Service Hotline:183-6871-7666
HomeAbout usProductsNewsCertificateNetworkFeedbackContact UsChina  
Products
  Tel:0577-61618066
Fax:0577-61618067
News 

A new round of rural reform started three years of pre cast billion

News sources :Wenzhou Zenen Electric Power Equipment Co. Ltd.         Release time :2014-4-8         Views :5256

In upgrading the rural power grid renovation held a National Energy Bureau of the conference, the National Energy Bureau said Zhang Guobao will start a new three year round rural power grid upgrading. The estimated investment scale of three years will exceed 200000000000.

A new round of rural reform goal is the transformation of rural power network through 3 years of upgrading project construction, so that there is no place basic transformation of rural power grid renovation before, and solve the problem of rural power supply capacity of the lack of new.

Through 12 years of rural "two change", "national rural electric change greatly, rural power grid structure was enhanced, the rural electricity prices significantly lower. But with the implementation of the "a series of measures to expand domestic demand, such as home appliances to the countryside" to start the rural consumption, rural electricity load and power consumption of rapid growth, the lag of rural power grid structure is weak and power construction problems begin to emerge, without electricity, Sichuan, Yunnan, Inner Mongolia, Xinjiang and other western regions problems.

There are still 530 through the electric Chinese population, at the same time there are still 1/3 provinces could not be achieved in rural and urban electricity price. It is reported, in the next three years, countries will be the annual investment of not less than 12000000000 yuan of capital, a new round of rural reform and upgrading is expected to bring 200000000000 yuan of investment.

In 1998 June, China launched the first rural power grid renovation work. So far a total arrangement of the rural power grid construction and transformation of the area without electricity power construction investment 462200000000 yuan, of which 92300000000 yuan of treasury bonds, 366600000000 yuan of bank loans, equity fund 3300000000 yuan. The last round of rural reform, the proportion of investment is approximately 80% loans and 20% national capital investment. (source: China energy network)

 last:Electrical equipment for highlights from...
 next:Warm congratulations to Wenzhou Zenen Electri...
Home  |  About us  |  Products  |  News  |  Certificate  |  Network  |  Feedback  |  Contact Us

Wenzhou Zeneng Electric Power Equipment Co., Ltd.
Tel: 138-6879-7685

主站蜘蛛池模板: 日韩无码免费观看视频 | 日韩精品操逼网站 | 日本高清成人 | 四虎影视成人在线 | 日韩精品文文久久 | 国模吧 大胆女模在线观看 亚洲成人影片 | 亚洲精品一区AV在线播放 | 久久麻豆精亚洲AV品国产拍拍 | 国产品精品久久久久不卡 | 中文字幕人妻高清无码 | 国产精品91在线一区 | avsp在线观看 | 色片影院在线观看 | 亚洲精品久久久久牙蜜区 | 东京热加勒比无码 | 中国挤奶哺乳午夜片 | 国产成人午夜高潮毛网站 | 中文字幕不卡在线观看 | 男女国产插爱一区二区 | www。日本A级片。cOm | 91在线无码精品秘 国产数学 | 亚洲成人免费AV在线播放 | 无码精品一区二区三区四区爱奇艺 | 2038亚洲中文无码 | 美女视频网站色 | 国产乱伦操| 无码九九九 | 亚洲成人亚洲区 | 国产黄色电影网 | 日韩一级免费毛片 | 黄网站在线免费 | 精品无码15区 | 免费 成人 美女在线观看 | 无码在线免费视频 | 国产蝌蚪91熟女秘 入口 | 亚洲Aⅴ一区二区三区 | 97无码免费视频 | 国产TS人妖调教重口男奴网站 | 无码精品人妻一区二区三区红楼 | 91一区无码| 三级特黄60分钟在线播放观看 |